【業界初!ナノ銀配合フロアコーティング】 創業31年グッドライフ 東京,横浜,大阪,福岡にショールーム完備

YouTube Twitter インスタ 
TEL問合せ
お問い合わせ

MENU

STEP 1
Consultation

Please contact us by phone or through our inquiry form.
Feel free to request a quote, make a showroom reservation, or ask any questions you might have about floor coating.

ご相談
STEP 2
Product Confirmation

We have showrooms in Shinagawa, Yokohama, Machida, Osaka, and Fukuoka.
You can walk on large floor areas where our floor coatings have been applied.
If you live far away and are unable to visit one of our showrooms, we can mail sample materials to you.

商品の確認
STEP 3
Request

We accept requests by phone, email, or in-store visit.
After receiving your request, we will send a confirmation form. Please keep it in a safe place.

お申込み
STEP 4
Site Inspection

On the day of the installation, please inspect the installation area together with our staff.
We also ask that you inspect the area with our staff before installation to confirm any existing scratches or repair marks.

施工箇所の確認
STEP 5
Protection

We will tape and cover the areas surrounding the installation to ensure the coating material does not spread beyond the confines of that area.
We also take care to protect your new home by covering the paths through which materials and equipment will be carried in.

養生
STEP 6
Removal of Existing Wax

If wax has already been applied, we will remove it thoroughly prior to installation.
*Only if there is wax already applied

既存ワックスの剥離
STEP 7
Cleaning / Surface Preparation

Even in newly built properties, the floors are dirtier than you might expect.
This step has the greatest impact on the final finish after installation. We thoroughly remove any oil, dust, or other residue adhered to the flooring.

清掃・下地処理
STEP 8
Application of GOOD LIFE COAT

The coating is applied with great care to prevent any foreign particles from mixing in.
Achieving an even, consistent coat requires the skill of an experienced professional.

グッドライフコートの塗布
STEP 9
Drying / Curing

GOOD LIFE COAT HIKARI is cured instantly using a UV irradiation device.
Other types of floor coatings are left to dry naturally for about three to four hours.

乾燥・硬化
STEP 10
Final Check / Installation Complete

Once the floor coating has fully cured, we carefully check for any missed spots or foreign particles.
After the check is complete, all protective coverings are removed, and we review the finished result with the customer! And the work is complete.

最終チェック・施工完了